JiangNao Railway (Xinjiang Hami Naomao Lake-Zhundong General Temple)-High-speed Railway-Engineering Case-Railway Engineering Machinery|Zhuzhou Xuyang Mechanical and Electrical Technology Development Co.,LTD
High-speed Railway
JiangNao Railway (Xinjiang Hami Naomao Lake-Zhundong General Temple)

  The railway connecting General Temple and Naomao Lake in the Xinjiang Uygur Autonomous Region of China is a national Class I single-track electrified freight railway. It is also a key component of the Beijing-Tianjin-Hebei-Northwest conventional railway corridor. The entire route traverses a variety of complex terrains, including deserts, Gobi, and plateaus, which has tested the adaptability, stability, and versatility of the CPG500 track laying machine. The track laying construction work for this project was fully undertaken by Xuyang Technology, which developed a specialized track laying plan based on the clients construction requirements, ensuring the project was completed on time, to the required quality, and in full quantity, earning consistent praise from the client.