The project line passes through the Royal Gardens of the UAE, the city periphery and the sand Mo, mountainous areas, coast, etc., the whole line includes 182 Bridges, 313 culverts, 9 The construction of the tunnel, 1745 facilities relocation and other projects were completed by using our companys CPG500 long rail laying unit, which effectively overcame the wide range and difficulty of the project.
Large, high temperature and complex construction environment problems.